Consent documents

Consent documents

HNZPT Archaeological Authority Form A: Central Interceptor (May 2019)
Hearing panel’s decision
Main works designation conditions – January 2014
Notice of Requirement 1 – August 2012
Notice of Requirement 2 – August 2012
Notice of Requirement 3 – March 2013
Main works resource consent conditions – December 2013
Network discharge consent decision and conditions – September 2014
Main works correction to consent duration for earthworks - April 2017​
Main works deviation consent and conditions – March 2018
 

Main project works - evidence

Part A: Expert evidence

 
1. Mark Ford (Corporate)
 
2. Tim Munro (Corporate - Project Overview)
          Appendix A
          Appendix B
          Appendix C
          Appendix D

3. Clint Cantrell (Project Design / Objectives)
          Appendix A
          Appendix B
          Supplementary evidence (1 August 2013)

          Reply evidence of Clint Cantrell (13 August 2013)
                     Appendix C (13 August 2013)
                     Appendix D (13 August 2013)
                     Appendix E (13 August 2013)
                     Appendix F (13 August 2013)
 
4. John Cooper (Project Construction)
          Appendix A

          Reply evidence of John Cooper (13 August 2013)
 
5. Belinda Petersen (Corporate - Consultation and Conditions Overview)
         Appendix A
         Appendix B
         Appendix C
         Appendix D
         Appendix E
         Appendix F
         Appendix G
         Appendix H
         Appendix I
         Appendix J
         Appendix K
         Appendix L 
        Supplementary evidence (consultation and conditions)
        Supplementary evidence (1 August 2013)

        Reply evidence of Belinda Petersen (13 August 2013)
                  Appendix M (13 August 2013)
                  Appendix N (13 August 2013)

6. Craig Mcilroy (Auckland Council Stormwater)
 
7. Graeme Twose (Groundwater and Surface Settlement)
         Appendix A
         Appendix B
 
8. Peter Millar (Vibration)
        Appendix A 
        Appendix B
        Appendix C
        Appendix D

 9. Mat Cottle (Noise)
         Appendix A
         Appendix B
         Appendix C
         Appendix D

         Reply evidence of Matt Cottle (13 August 2013)

10. Leo Hills (Traffic / Transport)
         Appendix A
         Appendix B
         Appendix C
         Appendix D
         Appendix E
         Supplementary evidence (traffic)

         Reply evidence of Leo Hills (13 August 2013)
                   Appendix F (13 August 2013)
                   Appendix G (13 August 2013)

 11. John Goodwin (Landscape / Visual)
         Appendix A
         Appendix B
         Appendix C
         Appendix D
 
 12. David Slaven (Ecology)
        Appendix A
        Appendix B
        Appendix C

        Reply evidence of David Slaven (13 August 2013)
                  Appendix D (13 August 2013)
                  Appendix E (13 August 2013)

13. Peter Roan (Marine Ecology from EPR)
         Appendix A - Part 1
         Appendix A - Part 2

         Reply evidence of Peter Roan (13 August 2013)
         Clarifications to Commissioners (28 August 2013)
 
14. Charles Kirkby (Air Quality)
         Appendix A
 
15. Garry Maskill (Cultural/Iwi)
        Appendix A
        Appendix B
        Appendix C
        Appendix D
        Appendix E
        Appendix F
        Supplementary evidence (Te Akitai)
 
16. Marje Russ (Planning)
         Appendix A
 

Part B: Full construction site drawings

 
0 – Index

1 – Key facts table

2 – Overall site layout and plans

3 – Corridor Plans for main tunnel and link sewers

4 – Geological maps

5 – Western Springs site

6 – Mt Albert War Memorial Reserve site

7 – Mt Albert War Memorial Reserve car park site

8 – Lyon Avenue site

9 – Haverstock Road site

10 – Walmsley Park site

11 – May Road site

12 – Keith Hay Park site

13 – Pump Station 23 (Frederick Street) site

14 – Kiwi Esplanade site

15 – Mangere Pump Station

16 – Motions Road site

17 – Western Springs Depot site

18 – Rawalpindi Reserve site

19 – Norgrove Avenue site

20 – Pump Station 25 (Miranda Reserve) site

21 – Miranda Reserve site

22 – Whitney Street site

23 – Dundale Avenue site

24 – Haycock Avenue site

25 – Construction Maps

Part C: Other relevant information

Proposed designation conditions
Reply set of designation conditions (13 August 2013)
Clean set of designation conditions (13 August 2013)

Proposed consent conditions
Reply set of consent conditions (13 August 2013)
Clean set of consent conditions (13 August 2013)

Legal submissions
     Appendix A
     Appendix B
Closing legal submissions (13 August 2013)
   Attachment C (13 August 2013)
   Attachment D (13 August 2013)

Central Interceptor Letter re Conditions 20 August 2013
Post-hearing consent conditions clean - v1
Post-hearing consent conditions - v1
Post-hearing designation conditions - v1
Post-hearing designation conditions clean - v1

Response to Commissioners (20 September 2013) 

TO AC response to Commissioners s41C direction COMBINED
TO AC response to Commissioners s41C direction
Drawings of proposed Lyon Avenue site and Mount Albert Grammar School Alternatives (Map 1Map 2Map 3)
Memorandum from AECOM New Zealand Limited
Memorandum from Arborlab Consultancy Services Limited
Letter from Traffic Design Group Limited
Correspondence from Ministry of Education
Memorandum from Marshall Day Acoustics Limited
Memorandum from Tonkin and Taylor Limited
Central Interceptor Main Project Works - Comparative assessment of proposed Lyon Avenue site and MAGS Alternative sites
Amended drawing of proposed Keith Hay Park site - construction works plan

Resource consent documentation

Central Interceptor Main AEE – Part A (1MB)

Central Interceptor Main AEE – Part B (116MB)

Central Interceptor Main AEE – Part C: Drawings Set (37MB)

Central Interceptor Main AEE – Part D


Landscape Assessment Report (1MB)
Figures (116MB)
                                                  
Arboricultural Assessment Report (11MB)
                                                 
Ecological Assessment Report (12MB)
                                                  
Archaeological Assessment Report (8MB)
Appendix 1 (24MB)
Appendix 2 (85MB)
                                                  
Traffic Assessment Report (2MB)
Appendices (38MB)
                                                  
Noise Assessment Report (6MB)
                                                  
Vibration Assessment Report (330KB)
Appendices (15MB)
                                                  
Odour Assessment Report (2MB)
                                                  
Contamination Assessment Report (25MB)
Site Management Plan (2MB)
                                                  
Groundwater Settlement Report (56MB)

Erosion and Sediment Control Report (10MB)

Central Interceptor Section 92 Response Report

December 2012 Section 92 Response Report
- Auckland Council S92 further information request letter
- Property instruments
- Appendix A ESCPs and text
- Appendix B chemical treatment management plan main tunnel
- Draft construction discharge management plan
- Archaeology
- Contamination
- Traffic
- Noise
- Vibration
- Trenching drawings

March 2013 Section 92 Groundwater Response Report
 
13 May 2013 Section 92 Response Report
 
27 May 2013 Addendum to May Section 92 Response Report