Apply for a connection in Clevedon

Clevedon connection extended offer
Clevedon Village is growing. In response, we're working closely with local developers and installing new water and wastewater services to accommodate growth. All new developments will be required to connect to the new network. However, existing properties within the service area can also make the most of this opportunity and may also be able to connect.

This page is to help existing property owners understand more about water and wastewater connections, the cost and process involved in getting a connection. There are three connection options to consider (see below).

If you run a business or you’re looking to subdivide, click here to contact us as additional fees may apply.
Apply for a connection in Clevedon

Wastewater and standard water connection

  • Connect to our reliable wastewater and water service.
  • Reduce environmental pollution from failing septic tanks.
  • A safe, reliable and resilient water supply that requires little ongoing maintenance or effort.
  Early connection (sign up by 30 June)
IGC metropolitan $14,168
New water meter $1,167.25
Wastewater pit (supply and connect) $9,200 (save $7,130)
Technical review $222.53
Network authorisation $167.90
Total $24,925.68

Rates are subject to change from 1 July
Apply for a connection in Clevedon

Wastewater and town to tank connection

  • Connect to our reliable wastewater and water service.
  • Reduce environmental pollution from failing septic tanks.
  • Increase your resiliency while remaining self-sufficient most of the time.
  • Designed to top-up your existing rain tank over a few days.
 
  Early connection (sign up by 30 June)
IGC metropolitan $7,084
Low volume water IGC $747.50
Wastewater pit (supply and connect) $9,200 (save $7,130)
Technical review $222.53
Network authorisation $167.90
Low flow meter with back flow prevention device $1,553.65
Total $18,975.58

Rates are subject to change from 1 July
Apply for a connection in Clevedon

Wastewater only

  • Connect to our reliable wastewater service.
  • Reduce environmental pollution from failing septic tanks.
  Early connection (sign up by 30 June)
IGC metropolitan $7,084
Wastewater pit (supply and connect) $9,200 (save $7,130)
Technical review $222.53
Network authorisation $167.90
Total $16,674.43

Rates are subject to change from 1 July
When will services be available?
When will I be able to apply?
When is the early bird special available?
Do I have to connect now?
Do I have to decommission my septic tank?
Will I need to install a wastewater pump?
Can I connect to the water network without connecting to the wastewater network?
I currently have a rain tank, what are my options for connecting to the water network?
What happens to my stormwater if I no longer have a rain tank?
What is Auckland Council’s connection scheme and targeted rate proposal?
What do I do now?