Every day, Auckland’s wastewater network carries more than 400 million litres of wastewater from our homes and businesses to treatment plants, helping protect public health and our environment.

While most of us don’t think about what happens to water after we flush the toilet or wash the dishes, Watercare sees first-hand the challenges involved in keeping this essential service running. When wastewater pipes become blocked or overwhelmed, the effects can reach our beaches, waterways, homes, community centres and businesses.

As Auckland grows, we’re working to improve a network that’s under increasing pressure from ageing infrastructure, a changing climate and avoidable blockages.

How Auckland’s wastewater network performed

Overall wastewater overflows reduced two per cent in the past year, down from 5670 the year before to 5558. While the overall number has reduced, the causes and locations of overflows give us useful insights into how we can reduce them even more.

Since the southern section of the Central Interceptor tunnel was commissioned in early 2025, an estimated 741,000 cubic meters of wastewater and stormwater overflows have been prevented from entering the environment (to July 2026), demonstrating the benefits of targeted investment.

Why wastewater overflows happen

Various conditions can cause wastewater networks to overflow. The response we take to an overflow depends on what conditions have caused it.

Blockages were associated with 4146 of the 5558 (75 per cent) wastewater overflows recorded last year, making them a major contributor and a challenge to manage the network performance.

Dry weather

Overflows in dry conditions are commonly linked to blockages damaged pipes or equipment issues

Wet weather

During heavy rain, stormwater and groundwater can enter wastewater pipes and add to the volume the network has to carry. As combined networks are designed to carry both stormwater and wastewater, a small amount of rain can have a huge impact.

Wet-weather overflows can be influenced by:

  • Stormwater or groundwater entering the wastewater network
  • Blockages such as roots, fats and rags
  • Damaged or broken pipes
  • Local capacity constraints.

This year, uncontrolled wet weather overflows increased, as it was a wetter year, reinforcing the need to keep finding and reducing inflow sources and to improve network resilience.

Some parts of Auckland experience more overflows than others

The annual Network Discharge Consent report looks at 36 wastewater catchments. Recurring patterns help us target investigation, maintenance and investment.

Half of all overflows occurred in five wastewater catchments last year. These are not the only places where overflows occur, but they are among the areas where focused action remains important.

Investing in a more resilient wastewater network

2025/2026 saw significant investment in wastewater infrastructure across Auckland.

This included major projects that are already delivering benefits to communities, such as completing the Central Interceptor wastewater tunnel from Point Erin to the Māngere Wastewater Treatment Plant.

Other significant wastewater upgrades last year to support resilience and growth across Auckland included:

  • Snells Beach: Commissioning a new wastewater treatment plant
  • Clarks Beach Wastewater Treatment Plant: Completing a new outfall and technology upgrades
  • Eastern Interceptor: Connecting a new wastewater main as part of the $64 million Archboyd wastewater upgrades in south Auckland.
  • Rosedale: Completing a large concreate pour for the new confluence chamber at the Rosedale Wastewater treatment plant.
  • Beachlands and Maraetai: Completing critical wastewater renewals to enable a more reliable wastewater network by relining 6.2kms of local pipes
  • Western and Eastern Isthmus Improvement programme: Multi-stage work to relieve local constraints and reduce overflows.
  • Northern Interceptor: Integration and complementary catchment upgrades across Henderson
  • Upper Tamaki: staged capacity upgrades in Otara and Howick
  • East Coast Bays and Orakei / Hobson Bay: targeted relief an renewal programmes.

What does that mean?

A guide to understanding water and wastewater terms we use at Watercare

Controlled overflow location

A physical location, also called an Engineered Overflow Point (EOP), where a discharge occurs from a structure specifically designed and constructed to allow for wet weather overflows.

Uncontrolled overflow locations

Any point in the wastewater network not specifically designed or intended to discharge wastewater.

Dry-weather overflow

When less than 1mm of rain has fallen in the previous 24 hours

Wet-weather overflow

When 1mm or more of rain has fallen in the previous 24 hours

Major events

Serious overflows that result in significant environmental, public health, or property impacts.

Inflow (Stormwater)

Occurs primarily as direct stormwater entry, often via private property drainage features- such as roof downpipes connected directly to gully traps or low-lying gully traps receiving surface runoff- and occasionally through low-lying public manholes.

Infiltration (Groundwater)

Occurs as groundwater seeps into pipes through cracks, defective joints, or broken/poorly constructed pipework in both the public and private sections of the network.